24-a Moscow AV, Tbilisi see on map
Tbilisi: 558 77 88 53 (558 78 00 83) Batumi: ‎‎555 86 00 68 order a call
Actions and Novelties

Questions about the installation of stretch ceilings from Master Ceiling clients

Customers often ask us questions about the optimal time for ordering stretch ceilings, as well as installation work and their duration. Answers to them will be presented below.

gasach’imi ch’erebis daq’enebastan dak’vshirebit

It is clear that a cosmetic or full-scale renovation is a planned event. Spontaneity in this matter is best avoided. This can lead to unnecessary costs. The same applies to the selection of stretch ceilings. All questions regarding the process should be thought out in advance. This is important already because spontaneity in this context can lead to unsatisfactory results. Subsequently, a large-scale rework may be necessary.

Below are the most common questions from our customers and the answers to them.

1. When do you need to select a stretch ceiling and order it?

It is desirable to do this in the following two scenarios:

  • You have already thought about the design of the room where the renovation is being carried out or planned. At this point, you should know what kind of ceiling you want. The optimal scenario is an order after putting in order the walls and preparing the main ceiling, or at the stage of solving these problems.
  • You still don’t know what kind of ceiling you need. The tasks related to the selection and ordering should be solved after the main finishing work has been done. This will allow you to get an idea of what colors and textures will be optimal in terms of combination with the renovation.

2. Repair is in progress. When should you install a stretch ceiling?

When the dusty work is finished, and the walls are covered with a primer, you can call a specialist for measurements. Then he will tell you when to plan the installation.

Here’s an example: a primer is planned for the morning of the next day. You can call specialists and order services for the second half of this day (after priming the walls).

During the measurement, the employee will offer to conclude a contract. In it we will write down all the main points regarding cooperation.

3. How quickly will the ceiling be installed?

In a simple case, the work of specialists will take 3-4 hours. If additional tiers and structures are needed, the time will increase. The installation date will be specified in the agreement. If the installers are free, installation is possible on the same day.

Most often, a day passes from measurements to installation.

The Master Ceiling team is engaged in the installation of stretch ceilings in Tbilisi, Batumi and throughout Georgia

To order a stretch ceiling, call:

  • Tbilisi: 558 77 88 53
  • Batumi: ‎‎555 86 00 68

Free measuring

Send request or call us: 558 77 88 53