Many customers come to us with the desire to order a multi-level suspended ceiling and, according to old memory, consider it necessary to order a plasterboard box, which will serve as the lower level that frames the main ceiling part.
And they are sincerely surprised when they find out that this very second level is absolutely calmly made also from PVC profiles and film 😉
Yes! And it is installed together with the central part. And the whole installation takes 3-5 hours. And building debris after installation does not need to be taken out. And you don’t have to wash out the dust! And anyway – take and call the guests immediately after installation!
It is these multi-level stretch ceilings that the Master Ceiling team in Tbilisi sets!
To order multi-level ceilings made of PVC film, call us at:
Call us!